All the framing, inside and outside, is done. The permanent stairs are done for the basement, in the house and from the garage. The permanent staircase from the main floor to the second floor will be completed in a few days; we’re planning to pick up the ready-made maple volute next week. The temporary staircase from the house has now moved over to the garage apartment, which will give the electrician, who just started, and the plumber (currently taking estimates), easy access. Tom will start calling drywallers fairly soon, so they can start as soon as the wiring and plumbing are finished.
I’ve started ordering light fixtures and towel warmers and have a list of things to order — more light fixtures, a corner bathtub, plumbing fixtures. One thing everyone remembered from last year’s trip to France was towel warmers, so I did some research. While Runtal is the market leader, they’re out of our budget, but I read good things about Warmly Yours and was able to order their Infinity model online from Costco.ca without a membership. A bit of a splurge, but a modest one and also practical in our climate.
On a trip to the city at the beginning of the month, we stopped at Ikea, since they were having their bathroom sale, to pick up to vanities with sink tops for the workshop bathroom (very tiny) and garage bathroom (much larger, and with a shower so anyone muddy from gardening or chores can clean up). Once we get them set up, we’ll be able to decide if we want them for the apartment and the rest of the house. The price is definitely right, especially with the sale (there’s another one in July, I believe); the quality is good; and I like the drawers and all the storage. We picked the 48″ Godmorgon/Odensvik with four drawers, in walnut, for the garage; and the 20-1/8″ Tyngen.
In between, we’ve been welcoming babies, and dealing with mud, snow, ice, mud, snow, ice, slush, snow, and more mud. Spring seemed closer one month ago than it did last weekend. But the days are slowly getting warmer and longer, which is delightful.
Earlier this month, on a very grey day,
The garage entrance to the house, with the garage bathroom at right (behind the landing),
Garage doors are coming soon. In the meantime, orange tarps make for a drier, warmer place to work and give a sunny glow. Making the basement stairs for the garage entrance,
Moving them to the permanent location,
In place,
The view from the basement entrance and the cold room,
The basement stairs inside the house,
The view from the basement,
Electricity in the workshop!
More stairs. Temporary ones now in place to the apartment. Goodbye, ladder!
Working on the main staircase in the house,
The view from the second floor,
Filed under: Country Life, Farm Life, House, Spring |
Leave a Reply